Our contractor is selected, deposits are paid, and our remodel begins in February! We’ll be doing both our half bath on the first floor and our main bathroom upstairs. Here’s a peek into the direction of our main bathroom:
- Polished nickel fixtures – I like the warmth of nickel over chrome.
- Marble hexagon floor tile – Just wait for all of the “shoefies!”
- Subway tile in 4″ x 12″ inches instead of the traditional 4″ x 6″. We’ll be going up to the ceiling in the shower/bath and 48″ up the wall around the rest of the room.
- Paint in Sherwin Williams “Riverway” that I painted last year and am still in love with. We’re completely gutting the bathroom because there’s water damage and the previous owners put the tile up higher than what I’d like to go with, so we’ll have fresh drywall to work with.
I’ll link the materials eventually, but I need to place my own orders first with the supply chain issues! 😉 This weekend, we’ll start looking at bathtubs, toilets, and faucets. Our contractor suggested that we start selecting all of the materials and ordering them as soon as possible to avoid delays.
–
Let’s keep in touch!
Instagram / Facebook / Pinterest / Bloglovin’
This post contains affiliate links.